Academic Engagement (Representative) |
Publications |
[1] Chen Yanru, Zhang Tujingwa, Du Qian, et al. Prediction of Indoor Thermal Comfort Level of High-speed Railway Station Based on Deep Forest. Computer Applications, 2021, 41(01): 258-264. [2] He Juan, Huang Fuling, Chen Yanru, et al. Analysis of Third-party Remanufacturingin Presence of Parallel Importation. Computer Integrated Manufacturing Systems, 2021, 27(01): 284-295. [3] Li Decheng, Chen Yanru, Zhang Zongcheng. A Branch-and-price Algorithm for Electric Vehicle Routing Problem with Time Windows and Mixed Fleet. Systems Engineering Theory and Practice, 2021, 41(04): 995-1009. [4] Nan Li Jun, Chen Yanru, Zhang Zongcheng. An Improved Adaptive Large-scale Neighborhood Search Algorithm to Solve the Dynamic Demand Mixed Vehicle Routing Problem. Computer Application Research, 2021, 38(10): 2926-2934. [5] Wang Qiuwen, Chen Yanru, Liu Yuanchun. Metro Short-term Traffic Flow Prediction with ConvLSTM. Control and Decision, 2021, 36(11): 2760-2770. [6] Yanru Chen, Lu Yang, Yangsheng Jiang, et al. Joint Replenishment Decision Considering Shortages, Partial Demand Substitution, and Defective Items. Computers&Industrial Engineering, 2019, 127: 420-435. [7] Zhihong Yao, Rong Hu, Yi Wang, Yangsheng Jiang, Bin Ran, Yanru Chen. Stability Analysis and the Fundamental Diagram for Mixed Connected Automated and Human-driven Vehicles. Physica A: Statistical Mechanics and Its Applications, 2019, 533: 121931. [8] Long Xiaoqiang, Li Jie, Chen Yanru. Metro Short-term Traffic Flow Prediction with Deep Learning. Control and Decision, 2019, 34(08): 1589-1600. [9] Yao Zhihong, Jiang Yangsheng, Wang Yi, Chen Yanru. Discrete Model of Dynamic Heterogeneous Traffic Flow Platoon in Internet of Vehicles. Journal of Beijing Jiaotong University, 2019, 43(02): 107-116. [10] Yanru Chen, Bing Yi, Yangsheng Jiang, et al. Inter-Arrival Time Distribution of Passengers at Service Facilities in Underground Subway Stations: A Case Study of the Metropolitan City of Chengdu in China. Transportation Research Part A: Policy and Practice, 2018, 111: 227-251. [11] Li Jie, Chen Yanru, Yang Lu. Regional Logistics Demand Forecasting Based on Two-stage Combination Prediction Model. Information and Control, 2018, 47(02): 247-256. [12] Yang Lu, Chen Yanru, Yang Jie. A Joint Replenishment Problem with Shortage and Defective Items. Chinese Journal of Management Engineering, 2018, 32(04): 195-203. [13] Chen Yanru, Yang Lu, Liu Sirong. Arrival Distribution Fitting of Early Peak Elevator Passenger Flow for High-rise Office Buildings in CBD. Computer Engineering, 2017, 43(12): 283-291. [14] Chen Yanru, Wahab M I M, Ongkunaruk P. A Joint Replenishment Problem Considering Multiple Trucks with Shipment and Resource Constraints. Computers & Operations Research, 2016, 74: 53-63. [15] Ongkunaruk P, Wahab M I M, Chen Yanru. A Genetic Algorithm for A Joint Replenishment Problem with Resource and Shipment Constraints and Defective Items. International Journal of Production Economics, 2016, (175): 142–152. [16] Chen Yanru, Jiang Yangsheng, Wahab M I M, et al. The Facility Layout Problem in Non-rectangular Logistics Parks with Split Lines. Expert Systems with Applications, 2015, 42(21): 7768-7780. |
|
Projects |
[1] Research and Application Demonstration of Key Technologies for Intelligent Traffic Signal Control Optimization. Project of Provincial Science and Technology Department (Project No.: None). November 2021-March 2024. Investigator. [2] Transportation System Full Life Cycle Intelligent Solution Consulting Service. Project Source: Beijing Noah Mingsheng Transportation Technology Co., Ltd. (Project No.: None). April 2021-March 2025. Investigator. [3] Research on the Main Framework and Achievements, Design, Intelligent Analysis and Visualization Modules of Railway Logistics Data Analysis and Intelligent Platform System. Project Source: China Railway Fourth Survey and Design Institute Group Co., Ltd. (Project No.: WR111021H02010). October 2020—April 2021. Principle Investigator.. [4] Research on Traffic Safety Control System on Long Ramp of Mombasa-Nairobi Railway. Project Source: Africa Star Railway Operation Co., Ltd. (Project No.: R113620H01076). September 2020-December 2020. Investigator. [5] Special Research on Passenger Flow Forecasting During the Feasibility Study Stage of S5 Line and S5 Renshou Branch Line of Chengdu-Meishan City Railway. Project Source: China Railway Eryuan Engineering Group Co., Ltd. (Project No.: R113620H01022). April 2020-June 2020. Investigator. [6] Identification, Forecasting and Matching Planning of Logistics Supply and Demand in the Mobile Internet Environment. National Program on Key Research Project (Project No.: none). March 2019-December 2022. Investigator. [7] Design and Optimization of An Extended Hub and Spoke Express Delivery Network for Hybrid Electric Logistics Vehicles and Fuel Logistics Vehicles——Considering the Impact of Charging Queues. National Natural Science Foundation of China General Program (Project No.: 2017G01084). January 2018-December 2021. Principle Investigator. [8] Research on EPC+BOT Model Innovation in Chishui River Bridge Project Construction. Project Source: Sichuan Highway and Bridge Construction Group Co., Ltd. (Project No.: WR111020H02005). December 2019-December 2022. Principle Investigator. [9] Research on EPC+BOT Model Innovation in Chishui River Bridge Project Construction. Project Source: Sichuan Highway and Bridge Construction Group Co., Ltd. (Project No.: WR111020H02005). December 2019-December 2022. Principle Investigator. [10] Consultation on Comprehensive Technical Solutions for Intelligent Transportation. Project Source: Shenzhen Jinyi Technology Co., Ltd. (Project No.: WR111020H02003). December 2019 -December 2022. Principle Investigator. [11] Research on Decision-Making Mechanism and Marketing Policy of New Energy Vehicle Potential Customers-Taking Chengdu as the Background (Top). Sichuan Provincial Science and Technology Department Project (Project No.: 2017S17035). March 2017-December 2019. Principle Investigator. [12] Logistics Park Services Research on Demand and Characteristics. Project Source: China Railway Fourth Survey and Design Institute Group Co., Ltd. (Project No.: 2017H01045). January 2017-January 2017. Principle Investigator. [13] Subway Station Evacuation Management Considering Fire Accident. National Natural Science Foundation of China (Project No.: 51578465). January 2016-December2019. Investigator. [14] Product Allocation of Multifloor Distribution Center Considering Elevator Queuing System. National Natural Science Foundation of China (Project No.: 71402149). January 2015-December 2017. Principle Investigator. |
|