Engineering Management
.
LIU Jicai

Hits: Date:2022-11-12 10:43

Name

Liu Jicai

Gender

Male


Nationality

Chinese

Academic Post

Professor



RPh.D. Supervisor RMaster’s Supervisor

Academic Qualification

PhD



Graduation School

Nanyang   Technological University, Singapore


Academic Engagement

(Representative)

Publications

[1] Yining Zhou, Jicai Liu. Influence of   Government Credit Risk on PPP Projects in Operation Stage. International   Journal of Strategic Property Management, 2021, 25(3): 216-227.

[2] Fan Lili, Liu Jicai. Discussion on the   Training Mode of Engineering Management College Students. Education and   Teaching Forum, 2021, (16): 185-188.

[3] Gao Ruolan, Hu Jia, Liu Jicai. Tunneling   Analysis of State-owned Enterprises in PPP Projects. Operations Research and   Management, 2021, 3: 226-231.

[4] Gao Ruolan, Zhou Yining, Liu Jicai. Adverse   Selection of Investors in PPP Projects Based on Prospect Theory. China   Management Science, 2021, 29(01): 11.

[5] Li Gang, Liu Jicai, Ai Xin, Liu Yinan, Li   Honghui. Management Category Research on Influencing Factors of Distributed   Training Major Selection——Taking Southwest Jiaotong University as an Example.   Quality Education in Western China, 2021, 7(23): 145-147+151.

[6] Zhang Jing, Li Fangfang, Liu Jicai. Analysis   of the Influencing Factors and Strategies of College Students' Mental Health   in the Post-epidemic Era. Science Public: Smart Education, 2021(10): 2.

[7] Lei Xiaoying, Shu Hao, Liu Jicai. The Mode of   Government Guarantee and Toll Revenue Cap of PPP Projects Based on Real   Option model. Journal of Engineering Management, 2020, 34(05): 114-118.

[8] Liu Jicai, Hu Jia, Gao Ruolan. Research on   Tunnel Behavior of Enterprises Participating in PPP Projects——Empirical   Evidence Based on the Improved Panel Threshold Model. Journal of Systems   Management, 2020, 882-884.

[9] Liu Jicai, Hu Jia, Gao Ruolan. Influence of   Main Characteristics of PPP-Related Project on Tunnel Behavior: An Empirical   Analysis Based on Improved Panel Threshold Model. Journal of System   Management, 2020, 29(05): 882-894.

[10] Zhou Yining, Liu Jicai. Study on Supervision   Strategy of PPP Project Considering the Participation of Higher-level   Government. China Management Science, 2020: 1-16.

[11] Jiaqi Liu, Jicai Liu, Lujie Ruan. Revenue   Structure of the Dual-role as Investor-contractors in PPP Project. Nankai   Business Review International, 2020, 11(2): 283-298.

[12] Jiaqi Liu, Jicai Liu, Nana Liu. Government's   Control Rights Influence Investor's Escalation of Commitment in PPP Project:   Regulating Effect of Other-face Concern. Physica A: Statistical Mechanics and   Its Applications, 2020, 545: 123617.

[13] Ruolan Gao, Jicai Liu. Value of Investors’ Escalation   of Commitment in PPP Projects Using Real Option Thinking. International   Journal of Strategic Property Management, 2020, 24(5): 348–364.

[14] Yinglin Wang, Jicai Liu, Ruolan Gao, et al.   Government Subsidies in Public-private Partnership Projects Based on   Altruistic Theory. International Journal of Strategic Property Management,   2020, 24(3): 153-164.

[15] Jiaqi Liu, Jicai Liu, Gao R, et al.   Identifying Project Factors That Affect an Investor's Escalation of   Commitment in Public-private Partnership Projects. Project Management   Journal, 2019, 50(6): 686-698.

[16] Ruolan Gao, Jicai Liu. Selection of   Government Supervision Mode of PPP Projects During the Operation Stage.   Construction Management and Economics, 2019, 37(10): 584-603.

[17] Yinglin Wang, Huaizhu Oliver Gao, Jicai Liu.   Incentive Game of Investor Speculation in PPP Highway Projects Based on the   Government Minimum Revenue Guarantee. Transportation Research Part A: Policy   and Practice, 2019, 125: 20-34.

[18] Liu Jicai, Liu Jiaqi, Zhou Yining. Impact of   Face Concerns on Stakeholder's Escalation of Commitment in PPP Project: Base   on the Government and Private Sector. Chinese Journal of Management   Engineering, 2019, 33(04): 167-175.

[19] Wang Yinglin, Liu Jicai. Green Building   Incentive Model and Strategy Selection Based on Fair Preference Theory.   Statistics and Decision, 2019, 35(19): 42-45.

[20] Liu Jicai, Gao Ruolan, Xie Ruifeng. Real   Option Evaluation in PPP Projects Under Uncertainty of Interest Rate.   Operations Research and Management, 2018, 27(07): 170-176.

[21] Shi Jingfen, Qin Xingyu, Liu Jicai. Study on   Double Principle-agent Model of“Investors-Operators”Dual-role Party's in PPP   Projects. Soft Science, 2018, 32(09): 124-128+137.

[22] Yinglin Wang, Peng Cui, Jicai Liu. Analysis   of the Risk-sharing Ratio in PPP Projects Based on Government Minimum Revenue   Guarantees. International Journal of Project Management, 2018, 36(6):   899-909.

[23] Jicai Liu, Ruolan Gao, Charles Yuen Jen   Cheah. Pricing Mechanism of Early Termination of PPP Projects Based on Real   Option Theory. Journal of Management in Engineering, 2017, 33(6): 04017035.

[24] Jicai Liu, Ruolan Gao, Cheah, et al.   Evolutionary Game of Investors’ Opportunistic Behaviour During the   Operational Period in PPP Projects. Construction Management and Economics,   2017, 35(3): 137-153.

[25] Liu Jicai, Liu Jiaqi. Investment Profits of a   Dual Role Subject Based on the Operator-investor in PPP Projects. Industrial   Engineering, 2017, 20(06): 1-8.

[26] Wang Yinglin, Liu Jicai. Research on the Guarantee   Mechanism of PPP Model Applied in New Urbanization Construction. Management   Modernization, 2017, 37(01): 67-69.

[27] Wang Y, JiCai Liu. A Game Analysis of the   Incentive Mechanism Based on Investment Behavior of Investor in PPP Projects.   Journal of Industrial Engineering and Engineering Management, 2016.


Projects

[1] International   Rail Transit Project Lean Management System Research. Project Source: China   Harbour Engineering Co., Ltd. (Project No.: WR111020H02022). October   2020-March 2022. Principle Investigator: Liu Jicai.

[2] Malkang City   “14th Five-Year Plan” Smart City Construction Special planning. Project   Source: Malkang Municipal Bureau of Economy, Commerce and Information   Technology (Project No.: WR111021H02017). October 2020-May 2021. Principle Investigator:   Liu Jicai.

[3] Research on   the Modernization of Natural Disaster Emergency Management Capability in   Sichuan Province During the "Fourteenth Five" Period. Project   Source: Sichuan Provincial Development and Reform Commission (Project No.:   WR111020H02025). October 2020-November 2020. Principle Investigator: Liu   Jicai.

[4] ''China   Railway Global Construction Industry Policy Research Center'' Feasibility   Study Report. Project Source: China Railway Research Institute Co., Ltd.   (Project No.: WR111020H02021). May 2020-May 2022. Principle Investigator: Liu   Jicai.

[5] Whole-Process   Teaching Research of Engineering Management Major. Project Source: Glodon   Technology Co., Ltd. (Project No.: WR111020H02028). November 2019-November   2020. Principle Investigator: Liu Jicai.

[6] Rural Areas   in Sichuan Province Revitalization Planning Strategy Consulting Service.   Project Source: Beijing Century Qianfu International Engineering Design Co.,   Ltd. Chengdu Branch (Project No.: WR111020H02023). November 2019-December   2019. Principle Investigator: Liu Jicai.

[7] Industry-University   Collaborative Education Project. Project Source: Glodon Technology Co., Ltd.   (Project No.: 2019H010834). October 2019-December 2020. Principle   Investigator: Liu Jicai.

[8] Sichuan Neng   Strategic Planning of Lithium Investment Industry Development. Project   Source: Sichuan Energy Investment Lithium Industry Co., Ltd. (Project No.:   2019H010499). April 2019-September 2019. Principle Investigator: Liu Jicai.

[9] Panzhihua PPP   Project Bidding Evaluation. July 2018-September 2018. Principle Investigator:   Liu Jicai.

[10] PPP Project   for the Construction of Domestic Sewage Treatment Facilities in Panzhihua   City. Project Source: Panzhihua City Supervisory Committee (Project No.:   2018H010378). March 2018-March 2018. Principle Investigator: Liu Jicai.

[11] Multi-parties Escalation of Commitment and Control   in PPP Projects. National Natural Science Foundation of China (the Youth   Foundation) (Project No.: 71571149). January 2016-December 2019. Principle   Investigator: Liu Jicai.


Research awards  

[1] Reform Proposals   for the Investment and Financing Model of PPP Projects in China (Based on the   Perspective of Financial Institutions), 2021.

[2] The Second   Prize of the 19th Sichuan Province Outstanding Scientific Research   Achievements in Philosophy and Social Sciences, 2021.

[3] Excellent   Supervisor of PHD Student. SWJTU, 2018.

[4] Risk Analysis   of Project Financing and Concession Period of Wastewater Treatment Plant.   Third Prize of Excellent Philosophy and the Social Sciences Achievement of   Sichuan province, 2017.


Course Name

Undergraduate

Project Investment and Financing

Engineering Project Management   Sand Table Simulation


PhD

Research   Frontier of Management Engineering