Academic Engagement (Representative) |
Publications |
[1] Li Liang, Liu Zhiyan, Li Zenglu, Nie Jiajia, Lai Xiaodong. Manufacturer's Acquisition Strategy Choice Under Supply Uncertainty: Recycling or Dual-channel Procurement. Industrial Engineering and Management, 2020, 25(02): 74-81. [2] Li Liang, Xiao Jun, Liu Zhiyan, et al. Posture Analysis and Improvement Research of Casting Grinding Workers. Industrial Engineering, 2020, 23(04): 167-173. [3] Bofeng Fan, Yuling Yang, Liang Li. Study on the Environmental Consultation and Layout of Intercity Passenger Transportation Network in Urban Agglomerations. Ekoloji, 2019, 28(107): 4379-4386. [4] Li Liang, Li Luyun. Intuition or Reasoning, How Does Moral Judgment Form? Psychological Exploration, 2019, 39(04): 300-307. [5] Li Liang, Li Huiqi. Spillover Effect of Transportation Infrastructure in Sichuan Province. Highway, 2018, 63(11): 181-187. [6] Liu Jun, Xiao Yang, Tan Deqing, Li Liang. Promotion-price Decision Making and Dominant Mode as Well as Welfare of Distribution Channel in Resale Price Maintenance. Journal of System Management, 2018, 27(06): 1194-1204. [7] Bofeng Fan, Yuling Yang, Liang Li. Integrated Optimization of Urban Agglomeration Passenger Transport Hub Location and Network Design. EURASIP Journal on Wireless Communications and Networking, 2018, 2018(1): 1-7. [8] Liu Jun, Tan Deqing, Li Liang, et al. Study on Product Positioning-price Decision Making, Channel Structure and Welfare. Operations Research and Management, 2017, 26(10): 112-120. [9] Liu Jun, Tan Deqing, Li Liang. Game Analysis of Price Strategies and Dominant Structures in Supply Chains. Soft Science, 2017, 31(04): 132-138. [10] Liang Li, Rong Kai. Study on Risk Measurement of Large-scale Project Based on Risk Network. Mathematics in Practice and Theory, 2010. [11] Liang Li, Qiang Guo, Jun Li. Allocation of Emergency Searching and Rescuing Resources after Earthquake. Systems Engineering, 2009, 27(8): 1-7. |
|
Projects |
[1] Sichuan Province Wisdom Culture Research on Tourism Industry Development Management System. Sichuan Provincial Science and Technology Department Project (Project No.: Q111021S01005). January 2021-December 2022. Principle Investigator: Li Liang. [2] Research on the Standard System of Labor Quota in The Transportation Industry of the Group Company. Project Source: China Railway Chengdu Bureau Group Co., Ltd. (Project No.: WR111021H02029). November 2021-December 2021. Principle Investigator: Li Liang. [3] World Bank Loan "4.20" Lushan Earthquake Recovery and Reconstruction Rural Road Completion Report Compilation Project Contract. Project Source: Sichuan Provincial Department of Transportation and Highway Bureau (Project No.: WR111021H02031). November 2021-October 2022. Principle Investigator: Li Liang. [4] China Gezhouba Group Electromechanical Construction Co., Ltd. Feasibility Study Report for Developing Oil and Gas Engineering Business. Project Source: Southwest Petroleum University (Project No.: WR111021H02027). April 2021-December 2021. Principle Investigator: Li Liang. [5] Research on the Full Life Cycle Management Needs of Private Enterprises in Chengdu and the Xingang model. Project Source: Chengdu Federation of Industry and Commerce (Project No.: 2019H010565). May 2019-August 2019. Principle Investigator: Li Liang. [6] Social Impact Assessment and Consulting Services for the Demonstration Project of the Longmen-Baosheng-Dachuan Tourism Highway (Qionglai Section) in Lushan County. Project Source: Qionglai City Highway Maintenance Section (Project No.: WR111021H02001). May 2019-December 2021. Principle Investigator: Li Liang. [7] Research on Office Furniture Market Competitiveness. Project Source: Sichuan Yongheng Industrial Co., Ltd. (Project No.: 2019H010392). April 2019-February 2020. Principle Investigator: Li Liang. [8] Research on Comprehensive Harmonic Control Scheme and Equipment Development for Electrified Railway. Project Source: Shenhua Baoshen Railway Group Co., Ltd. (Project No.: R110420H01053). February 2019-January 2021. Principle Investigator: Xie Shaofeng, Investigator: Li Liang. [9] The Social Impact Assessment Report of the Qionglai Section of Tianxinqiong Expressway. Project Source: Qionglai Municipal Transportation Bureau (Project No.: WR111021H02004). July 2018-December 2021. Principle Investigator: Li Liang. [10] After the “4.20” Lushan Earthquake External Monitoring Service Project for the Implementation of Policies Such as Land Acquisition, Resettlement and Protection of Women and Children for the Restoration and Reconstruction of Rural Roads. Government Department Project (Project No.: 2017S33001). January 2017-January 2019. Principle Investigator: Li Liang. [11] Recovery and Reconstruction Rural Road World Bank Loan Social Impact Assessment. Resettlement and Monitoring Service Project, Traffic Department Highway Bureau. October 2015-March 2017. Principle Investigator: Li Liang. |
|